Designed as one supply
Boards, transfer switching, solar and storage planned together, with the priority set between sources.

Product
GSS Fleet Management System Fleet. Video. AI. One operational platform. Explore the platform
High and low current, transfer switching, solar with storage and EV charging, designed and built by one team.
Overview
We build the boards, the transfer switching, the solar and the storage as one system, wired so a fault can be traced and labelled circuit by circuit.
Boards, transfer switching, solar and storage planned together, with the priority set between sources.
A screen on the panel shows which source is live, which are healthy and what happened last.
Wiring laid out so a fault can be traced quickly, labelled and tested circuit by circuit.
Capabilities
Distribution at the centre, automatic transfer between sources, solar and storage behind them, and charging for electric vehicles.
01Electrical systems
High and low current, panel boards and main distribution boards, sized to the site load and built at any scale.
GSS installation
02ATS & PLC control
Automatic transfer between sources, with the logic in a PLC instead of a manual changeover, and the status on a screen at the panel.
GSS installation
03Solar & storage
Solar with battery storage, designed so a site can ride through a grid cut instead of stopping.
04EV charging
Charging for electric vehicles at homes, buildings and fleet depots, with the supply, protection and cabling behind every charger.
The tiles in place: the array is the roof surface.
Project · Solar Tile, 50 kW
Solar tiles sit in the roof instead of on top of it. This array is wired in a high voltage, low frequency configuration and backed by 400 AH of storage, so the building carries its own load.
installed capacity
battery storage
tile solar system in the Middle East
Where it belongs
We build transfer switching for sites that cannot wait for someone to change over the supply by hand.
Stations that cannot stop dispensing during a cut.
Pumps that must not lose their sequence.
Any load where a manual changeover is too slow.
Sites with several sources, where priority matters.
Contact
Tell us about your site, your fleet or your idea. We reply within 48 hours.