The plant room is where a building either works or does not, and it is the part nobody sees until it fails. GSS builds them whole: the pumps, the pipework, the boards and the controls, installed by one contractor and commissioned as one system.

End to endinstall and commissioning
MEPmechanical and electrical together
One tradeno coordination gap
The detail

What the job actually involved.

Mechanical

  • Pump skids assembled, aligned and set on their bases
  • Distribution headers and pipework run, supported and insulated
  • Valves, strainers and gauges placed where they can actually be reached
  • Pressure testing and balancing before anything is signed off

Electrical and control

  • Switchgear and distribution boards for the plant room load
  • Control cabinets for the pump sets and their sequencing
  • Cable containment, glanding and labelling throughout
  • Interfaces out to the building management system where one exists

Why one contractor matters

  • The mechanical and electrical scopes meet in this room, and that is where projects slip
  • One team means no argument about whose responsibility a fault is
  • Commissioning happens against the whole system, not each trade's part
  • The people who installed it are the people who come back to service it
Next step

Have something similar in mind?

Tell us about the site and what it has to do. We survey first, say plainly what is possible, and quote against a scope rather than a guess.